Network cutover readiness checklist
What to check before you change a live network or system. Most cutovers that go wrong were missing something simple: a rollback trigger nobody agreed, a site key nobody had, a test that left no evidence. This checklist covers the six areas we review before every cutover.
Why a checklist still matters
Experienced teams don't fail on the hard parts. They fail on the small things everyone assumed someone else had done. A short, shared checklist turns those assumptions into named owners and written answers, a day before the change instead of at 2 am.
Use it in your readiness meeting, a day or two before the window. Anything you can't tick is either fixed, accepted as a risk by the person who owns the go / no-go call, or a reason to move the date.
The checklist
1. Plan and method of procedure
- Every step has an owner, a planned start time and an expected duration.
- Dependencies and hold points are marked, with the person who releases each hold point.
- The change window fits the plan, with time kept back for a rollback.
- The pre-change state is captured: configurations backed up, baseline readings recorded.
- Vendor and third-party steps are confirmed in writing, with names and phone numbers.
2. Testing
- Pre-checks are written down and run the day before, and again on the day.
- Each test has a pass criterion, not just "check it works".
- Every test leaves evidence: a reading, a screenshot, a log or a signed record.
- Customer-facing services are tested end to end, not just the links in between.
- Someone who did not make the change confirms the acceptance tests.
3. Rollback
- Clear trigger points: which result, or which time on the clock, means you roll back.
- Rollback steps are written out in full, not "reverse the steps above".
- Time to restore is estimated, and it fits inside the change window.
- The rollback has been rehearsed or tested where that is practical.
- The person who calls the rollback is named, and so is their backup.
4. Communications
- Customers and users know what will happen, when, and what they will notice.
- Operations, the NOC and on-call teams have the plan and the contact list.
- One bridge or chat channel is set up for the night, run by one person.
- Update times are agreed: for example every 30 minutes and at each hold point.
- Messages are drafted in advance for success, for a rollback and for an overrun.
5. Sign-offs and authority
- The change is approved through your change process (CAB or equivalent).
- The go / no-go decision owner is named, and the criteria are written down.
- Contract and client requirements are checked: notice periods, approvals and outage limits.
- Everyone knows who can stop the work on safety grounds, and that they will be backed.
6. People and logistics
- Site access, keys, inductions and permits are arranged for every site involved.
- Spares, tools, test gear, cables and charged laptops are checked and on site.
- There is a shift plan with breaks, so nobody runs the critical steps exhausted.
- Risk assessments or SWMS are in place for the on-site work.
- The contact list, with mobile numbers, is checked the day before.
Five red flags we see most often
- "Rollback: reverse the above." If it isn't written step by step, it hasn't been thought through.
- No time to restore. Without it you cannot know whether the window is big enough to fail safely.
- Nobody owns the go / no-go call. On the night, the decision drifts to whoever is loudest or most tired.
- Tests with no evidence. "Looked fine" is not an acceptance record, and it will not help the next shift.
- The same people on shift for 14 hours or more. The riskiest steps often come last, when people are most tired.
Running the go / no-go call
- Status of every pre-check, read out against the plan, not from memory.
- Open risks and issues, each with an owner and a yes or no: do we proceed with it?
- Rollback confirmed: triggers, steps, time to restore and who calls it.
- People and sites ready: access, spares, shifts and contacts.
- The decision, made by the named owner and recorded with the time.
After the cutover
- Keep watch. Agree a hypercare period with extra monitoring and a named contact.
- Close it properly. Record the evidence, update the as-built records, and close the change.
- Learn from it. A short lessons-learned session while it's fresh, written down for the next one.
© 2026 ProjectCore · Human judgement. AI speed. · Free to use and share with your team. Want an independent check before go-live? projectcore.com.au/project-delivery.html · [email protected]
Want a second pair of eyes before go-live?
Our Cutover Readiness Review checks your plan, testing, rollback, communications and sign-offs, and gives you a clear go / no-go view and what to fix first. Fixed scope, agreed up front.